Burj Zanzibar in Fumba Town is designed to reach 96 metres in height.
The proposed skyscraper will be built at a cost of $5 billion.
Devki chairman is positioning himself as a green energy producer.
The Greenfield Terminal project was cancelled in March 2016.
The 28km road is expected to be ready by Jan 15, 2023.
Ergon Solair wins approval to build a 40MW solar plant at Kibos.
The American company says it stands ready to support the project.
UNON is seeking to revitalize the public face of its 140-acre facility.
KIND has already completed a feasibility study for the project.
The facility will hold 15 million cubic metres of water.